Infrastructure

LAND AND BUILDING

Our Factory is situated in the AMBAD MIDC area of NASHIK. Nashik is very close to Mumbai (only 185 km). Nashik is part of Golden Triangle Mumbai–Pune–Nashik.

Nashik is connected by :

1. Plain, 2. Central Railway and Road by National Highway Mumbai – Agra, Pune–Nashik, Aurangabad – Nashik.

We have our own Factory building of having carpet area of is 4000 sq.ft on our own plot at M–76, MIDC, Ambad Nashik – 422 010. The Details are as below.

Our Own Plot: 650 m².

Construction Area: Ground Floor – 3000 sq. ft. RCC Construction 1st Floor and 3000 sq. ft. Ground Floor.

Land and Building

MANUFACTURING SET UP

    Our Manufacturing setup consists of:

  • PCB assembly (population) Department equipped with assembly Station (Line).
  • Product Assembly line.
  • In process Quality Test Department.
  • Q. A. Dept.
  • Dispatch And Stores Department.
  • Service Department.
  • R & D Department.

LIST OF EQUIPMENTS AND MACHINERY

  • Digital Storage Oscilloscope.
  • High Voltage Breakdown Tester.
  • Digital Multimeter.
  • Digital LCR Meter.
  • Watt Meter.
  • Digital Test Bench inclusive of Voltmeter, Ammeter, Freq. Meter for The testing of Inverter and UPS.
  • Load Bank.
  • Wave Soldering Machine.
  • PCB Stuffing and Assembly line.
  • PCB Soldering Stations with Temperature Controller.

Copyright © 2024 Enermax- All Rights Reserved. Design byExplore the Best Dosing Systems for Your Industry Needs: Reliable Suppliers Revealed